Recipe
Recipe: Cross-team launch coordinator
Ship features that span engineering, marketing, and support without dropping a single handoff.
Ingredients
- One shared launch doc (Notion or Google Docs)
- Slack channel
#launch-YYYY-MM-DD - Linear board with swimlanes per team
- Feature flag in Meridian
- 30-minute daily sync for the final week
Steps
- T-14 days: Lock scope. Every team lead signs off on the launch doc.
- T-10 days: QA freeze. Only launch-blocker fixes land.
- T-7 days: Marketing assets finalized. Support scripts written.
- T-3 days: Dry run in staging. Flip the feature flag for internal users.
- T-0: Gradual rollout. 10% → 50% → 100% with monitoring.
- T+1 day: Retrospective. What broke? What held?
Anti-patterns
- Silent launches — marketing finds out on Twitter
- No rollback plan — feature flag is your safety net
- Single-person bottleneck — bus factor of one
Need a template? Grab the launch checklist and adapt it for your team size.